model upflow clarifier lime

Vinci Convincing Construction Visualization | Proposed Major Improvements for Wet Infrastructure

An example of a lightweight digital model of a proposed upflow clarifier and adjacent lime building. The structures were produced in a day according to design development drawings which were part of a 2000 page RFP document. View the 4d construction schedule diagram for the water plant → on which this structure is to be built.

This page last modified Thursday 26 May 2011.