Vinci LLC Architectural Renderings

Featured Links

Vinci LLC

5106 Hampton Avenue
Suite 205
Saint Louis, Missouri 63109-3115

T. 314-351-7456
C. 314-614-6578

mike@vincico.com

A few definitions:

Subject is site improvement under consideration; for a builder after a healthcare expansion project, this would be the actual expansion. This is the focus of Vinci’s construction visualization effort.

Context includes the terrain, improvements on site to remain or be removed, neighboring or adjacent structures, or more distant structures. Those context objects on site are of most interest, and may significantly affect construction of the subject. Neighboring context helps the audience orient themselves. Distant context improves the “convincing” quality of the construction visualization. Context is delivered in a montage by the base image. Immersive models normally require more aggressive context modeling. The flexibility of a context model is much less than that of the subject.

Montage is the process of applying either digital mode output or rendered art to a base image, usually a photograph of the site. Montage occupies one end of the Vinci Spectrum of Services, relying on the base image to convey site context (existing and neighboring structures). Digital modeling can be minimized at the expense of rendering.

Immersion is the production of a rich, comprehensive digital model that conveys all phases of the construction schedule. Immersion includes significant construction logistics items (cranes, offices), and both the subject (the building under construction) and neighboring structures. Terrain is represented in the digital model. Output from the model is not applied to or limited by base imagery; base imagery is not necessary. The average quantity of output of an immersive model is easily four to eight times the montage process.

Vinci™ Focus™ involves a detailed model of the subject, yielding a sequence of images of the subject from any direction. Focus™ completely ignores context and logistics (equipment) and concentrates on the development sequence of the building.

Vinci™ GCS™ (General Construction Sequence) is a simple aerial view of the worksite, showing principal logistics, circulation, and construction schedule. Vinci GCS includes VinciMeter™ and may be produced by montage or immersion. Immersion can efficiently yield multiple GCS, while montage normally yields one GCS.

Vinci™ DWS™ (Digital Worksite™) is a comprehensive worksite model used to produce graphics, but also can be used for limited site analysis. DWS is typically an immersion process.

Vinci ICM™ (Immersive Contextual Model™) is a comprehensive digital model covering a large area that includes terrain and improvements pertaining to a common organization. Most ICMs are created for medical, research, and university campuses where construction requires a systemwide approach.

Vinci™ Vignettes are graphics that briefly cover a significant but minor topic. These can be “before & after” images or a short sequence detailing a construction issue. Vignettes are normally produced by photomontaging output from a relatively immersive model onto a site photograph.

Vinci™ SubVision™ are images that illustrate subsurface conditions. Three types of Vinci™ SubVision™ are available: click to find out more. (Examples forthcoming).

These definitions are being developed as full pages in the “About” section.

View a sample of Vinci’s Work

Click on the images below to see examples of Vinci’s work. Note that this portfolio is not comprehensive.
Featured items are in-depth pages that illustrate the breadth of Vinci’s work.
Other pages show basic detail.
Links Pending are those that will be added in the near future.
Call 314-351-7456 or e-mail mike@vincico.com for further details.

G83B2 | Featured | Vinci™ DWS™
Industrial Expansion
Multiple GCS™ views generated by the Vinci™ DWS™.
Illustrations of an expansion built on the site of a former facility with similar functions.
Analytics and simple general construction sequence.
22 images produced.

R83A9 | Featured | Vinci™ Convincing Construction Vignettes™
Medical Center Campus Infill
Simple Set of Montage Vignettes.
Illustrations of user group interfaces with temporary construction operations.
Multiple additions on an active medical center campus.
25 images produced.

a8373

A8373 | Pending | Vinci™ DWS™
Medical Center Campus Infill
Multiple GCS™ views generated by the Vinci™ DWS™.
Illustrations of a delicate demolition and excavation.
Tight urban infill amid an active medical center.
124 images produced.

A8337 | Featured | Vinci™ DWS™
Distribution Warehouse
Site logistics, tilt-up construction, phasing, and multiple GCS™ views.
Vignettes include “Man on the Street” alternates.
Vinci SubVision™ shows what’s underground.
54 images produced.

A8316 | Featured | Vinci™ DWS™
Replacement Medical Center
Vinci™ General Construction Sequence™.
Big joint venture victory; stimulus project.
33 images produced.

A8306 | Provisional | Vinci™ DWS™/ ICM™
Campuswide Medical Center Construction
Multiple Vinci™ GCS™.
New patient tower, new precast parking deck, central energy plant, and parking vertical expansion.
Vinci™ SubVision X-Ray™ reveals existing utilities underground.
49 images produced.

A82AA | Pending | Vinci™ DWS™
Greenfield Water Treatment Facility
Multiple Vinci™ GCS™.
Clearwells, water handling, gravity thickeners, effluent and ultraviolet filters under construction.
49 images produced.

a82a4

A82A4 | Pending | Vinci™ DWS™/ ICM™
Greenfield Water Treatment Facility. One of Vinci’s most exciting projects!
Excavation, tunneling, underwater construction via multiple Vinci™ GCS™ and Vignettes.
Three-site facility, involving miles of tunnels, geology, and stratigraphy.
Custom equipment, heavy usage of analytics, contextual terrain, for community relations and marketing.
231 images produced.

A8226 | Featured | Vinci™ DWS™/ ICM™
Greenfield Water Extraction and Conditioning Facility.
Construction in a river and over hundreds of acres, several Vinci™ GCS™.
Two-site facility, showing water fluctuation, alternatives, and late breaking owner adds.
Analytics and contextual terrain at the intake, water treatment and electric substation on flat land.
86 images produced.

A8205 | Featured | Vinci™ DWS™/ ICM™
Major University Health System Sitework.
Vinci™ GCS™ and Detail Sequences with “Man on the Street” Vignettes.
Phasing on the front lawn of a major university hospital.
42 images produced.

A8187 | Featured | Vinci™ DWS™/ ICM™
Seismically Braced Patient Tower Addition.
Vinci™ General Construction Sequence™ showing sitework, phasing, logistics.
Immersive existing conditions help illustrate how work affects surrounding operations
at a busy medical center in a dense inner ring suburb’s major thoroughfare.
60 interview images, 3 annotated proposal plates produced.

a80b6

A80B6 | Pending | Vinci™ DWS™/ ICM™
Art Museum Expansion by signature architect
Site logistics, utilities, enabling work, phasing, and three GCS™ views.
Nearly 160 images produced.

A80B0 | Featured | Vinci™ DWS™/ ICM™
University Academic Building designed by signature architect
Enabling projects, excavation, constructibility, conveyed by a GCS™ and
several “Man on the Street” and “Swiss Watch” vignettes.
Nearly 120 images produced. David vs. Goliath again. Guess who won?

A80A4 | Featured | Vinci™ DWS™/ ICM™
Major University Laboratory
Construction visualization from schematics, focusing on phasing
demolition, excavation, and prevention of interruption of user group access and use.
Over 100 images produced. David vs. Goliath: Guess who won?

R7B87 | Featured | Vinci™ Focus™
Industrial Facility
Western USA
Building construction schedule as seen from several viewpoints,
generated by Vinci™ Focus™.
90 images produced.

A7B54 | Featured | Vinci™ Digital Worksite™
Water Treatment Facility | Southern USA
Twin immersive Vinci™ General Construction Sequences™ and vignettes,
generated by Vinci™ Digital Worksite™. Project rich in technical issues.
Over eight dozen images generated.

A7B53 | Featured | Vinci™ Digital Worksite™
Water Treatment Facility | Eastern USA
Immersive Vinci™ General Construction Sequence™ and vignettes,
generated by Vinci™ Digital Worksite™. Logistics options.
Over four dozen images generated.

A7B33 | Featured | Vinci™ Digital Worksite™
Regional Medical Center Specialty Patient Tower | Eastern USA
A Vinci™ General Construction Sequence™ and multiple feature sequences,
generated by Vinci™ Digital Worksite™. Sophisticated hoisting plan illustrated.
Over seven dozen images generated.

A7ABA | Featured | Vinci™ General Construction Sequence™
Medical Center Cast in Place Parking Deck
Simple “4-D” sequence showing phasing
and alternates for a 1000-car parking structure.
29 images generated.

R7AB5 | Featured | Vinci™ Vignettes
Medical Center Expansion | Southern USA
A Series of Temporary Traffic Redirection views,
part of a Vinci™ montage project.
10 of 12 vignettes shown here.

R7A96 | Featured | Vinci™ Digital Worksite™
Hospital Patient Care Expansion | Southern USA
Twin Vinci™ General Construction Sequences™ and three vignettes,
generated by Vinci™ Digital Worksite™. Vignettes covering rooftop work and phasing.
One montage sequene, two immersive Vinci™ GCS™ sequences.
26 images generated.

A7A04 | Pending | Vinci™ Digital Worksite™
Major University Research Laboratory
The largest and most expressive system of Vinci™ visualization ever produced.
Work spans three years and several hundred man-hours. This is the king of them all.
Brilliant enabling work, analysis, and site utility vignettes.
Several hundred images generated by Vinci™ DWS™.

A7992 | Featured | Vinci™ Digital Worksite™
Medical Center Expansion and Garage | Midwest USA
Twin GCS™ framesets illustrate Garage and Medical Center Expansion construction.
Three vignette sequences.
Over 5 dozen images generated by Vinci™ DWS™.

R7975 | Featured | Vinci™ General Construction Sequence™ and Vignettes
Medical Center Expansion | Midwest USA
Program options, construction challenges are explored by vignette sequences,
while construction is illustrated by a Vinci™ General Construction Sequence™ (not shown).
Over 40 images generated. Exemplary interior construction vignettes.

A7966 | Featured | Vinci™ General Construction Sequence™ and Client Correspondence
5-Level, 1500 Car Precast Parking Garage, 120,000 sf Footprint
Simple and quick montage Vinci™ GCS™
Take a look behind the scenes at Vinci’s typical preliminary review imagery.
20 images generated. Enabling work: precast storm water detention chamber .

A7887 | Featured | Vinci™ Digital Worksite™
Medical Center Expansion | Northeast USA
Vignettes illustrate general excavation, bank retention, underpinning, specialty excavation,
program options, and vertical expansion planning vignettes. A General Construction Sequence™
describes overall construction schedule. All produced by Vinci™ Digital Worksite™.
About five dozen images generated.

r7769

R7769 | Vinci™ Digital Worksite™
Corporate Headquarters Expansion | Midwest USA
Multiple views of multiphase construction from RFP schematic drawings,
generated by a Vinci™ Digital Worksite™. More than five sequences and several vignettes.
Over 80 images generated. Context-rich DWS, the first “modern” DWS™.

r7730

R7730 | Vinci™ Digital Worksite™
University Laboratory | Southeast USA
Multiple views of construction from schematic drawings,
generated by a Vinci™ Digital Worksite™. One Vinci™ GCS™ and several vignettes.
No base image involved.

R7713 | Featured | Architectural Illustration from an Immersive Digital Model
Shalom Church | City of Peace
Florissant, Missouri
Come visit the new phase of Shalom Church.

R76B6 | Featured | Flood Plain Illustration and Vinci™ GCS™
Industrial Training Center | Southeast USA
Watch the waters rise to convince the audience of the importance of a flood plain.

r7687

R7687 | Vinci™ DWS™
Regional Greenfield Medical Center
Midwest USA
Flexible immersive digital modeling of schematic plans yield illustrations of two schedule options.

r7675

R7675 | Vinci™ Digital Worksite™
Regional Greenfield Medical Center
South Central USA
Vinci’s Digital Worksite™ conquers a schematic plan in little more than a week.
Multiple vantage points, construction issue vignettes.

Houston

R7660 | Vinci™ Digital Worksite™ Medical Center Master Plan Additions
Southeast USA
Multiple Vinci™ GCS™ from several vantage points, illustrating widely separated master plan construction.
First extensive Vinci™ DWS™.

r7621

R7621 | Vinci™ GCS™
Medical Center Expansion
Midwest USA
Limited Vinci™ DWS™ imagery for key milestones in the schedule. One week delivery.

a75a5

A75A5 | Vinci™ GCS™
Patient Tower Vertical Expansion
Southeast USA
Twin Vinci™ GCS™ from opposite vantage points, illustrating widely separated construction.
Extensive subject modeling. Montage process.

R7570 | Featured | Vinci™ GCS™
University Research |
Southeast USA
A 6-frame construction sequence and 6-frame diagrammatic detail sequence.

R7565 | Featured | 2 Vinci™ GCS™ Sequences and Vignettes
Regional Medical Center Expansion
West Central USA
A 12-frame construction sequence and 8-frame diagrammatic detail sequence.
The main sequence photorealistically portrays a project still in schematic design.

M7541 | Featured | Vinci™ Focus™
New Laboratory
Western USA
A brief sequence illustrating construction of a laboratory, produced by a rich subject model. Context ignored.

R7538 | Featured | Vinci™ GCS™ and Vignettes
University Medical Center Expansion
Southeast USA
An 8-frame sequence and diagram set illustrating project construction.

R7519 | Featured | Vinci™ GCS™
Casino-Hotel High Rise
Midwest USA
A 24-frame sequence and diagram set illustrating project construction.
Extensive modeling of a complex subject, based on schematic drawings. A high-stakes winner.

R7514 | Featured | Vinci™ GCS™
Medical Center
Southeast USA
An 11-frame and 2-frame set of sequences illustrating project construction.

r7493

R7493 | Vinci™ GCS™
Industrial Facility
Northeast USA
A 14-frame Vinci™ GCS™ illustrating project construction.
First Vinci™ DWS™; the immersive technique used here has expanded
to become Vinci’s most powerful construction visualization process.

R7481 | Featured | Interior Rendering
Indiana University | Clarian Cancer Hospital
Indianapolis, Indiana
Rendering of the lobby, focusing on light feature.
Extensive digital modeling based on construction documents.

R7482 | Featured | Interior Renderings
Indiana University | Clarian Cancer Hospital
Indianapolis, Indiana
A view of the infusion room.

R7483 | Featured | Interior Renderings
Indiana University | Clarian Cancer Hospital
Indianapolis, Indiana
A rendering of a typical patient room.

r746a

R746A | Vinci™ GCS™
Medical Center | Heart Center
Southeast USA
Two construction sequences illustrating project schedule.

R7458 | Featured | Renderings from an immersive model
Southwest St. Louis Community Center
Saint Louis, Missouri
A network of images depicting the planned community center.
Proving ground for Vinci’s nascent rapid immersive modeling processes.

OSF Peoria

R7435 | Vinci™ GCS™, Animations, & Vignettes
Regional Medical Center and Parking Expansion
Midwest USA
A 9-frame and 3-frame sequence illustrating project construction.

r7424

R7424 | Vinci™ GCS™, & Vignettes
Provena St. Joseph Medical Center
Joliet, Illinois
A 9-frame sequence illustrating project construction.

r7418

R7418 | Vinci™ GCS™, Animations, & Vignettes
Saint Louis University | Research Center
Saint Louis, Missouri
A 12-frame sequence illustrating project construction, struck from a rich subject model.

Pfizer

R73A1 | Vinci™ GCS™
Pfizer | Research Building
Chesterfield, Missouri
A 9-frame sequence illustrating project construction. Context modeling.
This material was applied to a Vinci™ DWS™ in late 2006 to produce a fine series of studies of multiple sites under construction.

R7386 | Featured | Vinci™ GCS™
Saint Louis Community College | Wildwood Campus Phase I
Wildwood, Missouri
A classic 12-frame Vinci™ GCS™ illustrating project construction.
Digital model custom built according to design development drawings; rich photomontage.

R7377 | Featured | Before & After Vignettes
Old Warson Country Club
Ladue, Missouri
Six image pairs illustrating proposed grounds improvements.

Digital model photomontaged on site photographs. Predominantly Adobe Photoshop work.

Missouri Baptist

R7367 | Vinci™ GCS™ and Vignettes.
Missouri Baptist Medical Center | Patient Building Phase I
Western St. Louis County, Missouri
A classic GCS™ featuring a 13-frame sequence illustrating project construction.
Digital model custom built according to design development drawings. Montage-dominated GCS™.

Syracuse

R7337 | Construction Sequence
Syracuse University | Life Science Complex
Syracuse, New York
A 13-frame sequence illustrating project construction.

Syracuse

R7326 | Construction Sequence
Children’s Medical Center | Tower III B
Dallas, Texas
A 7-frame sequence illustrating project construction.

G7307 | Featured | Graphic
AIA Saint Louis | Baseball Playoff Poster
Saint Louis, Missouri
A 48” by 96” Poster for AIA’s window on Washington Avenue.

Pre-Vinci Illustrations by Michael De Vlieger

R72AB | General Construction Sequence
Cornell University | Life Sciences Building
Ithaca, New York
A classic, Vinci-style general construction sequence,
consisting of 11 frames illustrating project construction.
Best pre-Vinci sequence, laying the groundwork for Vinci™ GCS™.

R72B6 | Architectural Rendering
Centene Corporation | Field Office
Great Falls, Montana
Architectural illustration of the facility.
Digital model and photomontaged base image.

Centene

R729B | Construction Sequences, Diagrams, & Animations
Peninsula Regional Medical Center | Facility Expansion Phase I
Salisbury, Maryland
A network of 3 classic general construction sequences illustrating project construction.
First extensive existing context model.

Fed Reserve

R7258 | General Construction Sequences
Federal Reserve Bank
Saint Louis, Missouri
Two classic Vinci-style general construction sequences.
A 15-frame and 4-frame sequence illustrating project construction.
Subject modeled digitally.

Jardine

M7240 | Model, Diagrams, Presentation, and Animations
Kansas State University | Jardine Apartments
Lawrence, Kansas
A minute-long digital animation and presentation environment,

struck from a digital model.

NotreDame

G7218 | Model, Interview Graphics.
University of Notre Dame du Lac | Student Housing Master Plan
Lawrence, Kansas
Interview graphics and renovation modeling.

R70A8 | Featured | General Construction Sequence
Herrin Hospital | Inpatient Expansion
Herrin, Illinois
A classic Vinci-style general construction sequence from a ground shot,
consisting of 6-frames, illustrating project construction.
Minimal digital modeling (structural steel only). First use of modeling for steel frame.

Cape Fear

R70A0 | Link Pending | General Construction Sequence
Cape Fear Valley Medical Center | Patient Tower
Fayetteville, North Carolina
A classic Vinci-style general construction sequence featuring
30 consecutive still images illustrating project construction.
Developed without digital modeling.

R7048 | Architectural Rendering
Alberici Corporate Headquarters
Overland, Missouri
Architectural illustration of the new headquarters.

R7024 | Featured | General Construction Sequence
St. Louis Childrens’ Hospital | East Bay Expansion
Saint Louis, Missouri
A 9-frame sequence illustrating project construction schedule.

East Bay

G6116 | Renderings and Diagrams
Webster University | 1998 Master Plan
Webster Groves, Missouri
A series of diagrams, illustrations, and renderings for the master plan document.
Michael De Vlieger’s first aerial rendering.

About this Page

This web page was updated 15 April 2010.

End

This website is copyright ©2004-2010 Vinci LLC, all rights reserved.